Round and Round – 30th September

The wiring has been completed and testing is well underway. Some fine tuning of the servo start and end points along with checking that the current detectors all function. The tables have been set up on JMRI and the soft mimic panel tracks the loco.

Continue Reading Round and Round – 30th September

The Difficulty with Names – 15th August

It was now clear that a new layout was required and that it should have the following characteristics:-A1 sized foamboard on an aluminium frameautomated N-Gauge layoutblock detection using DCC current sensors3.7g servos to move the pointsdemonstration layout to promote discussion about electronic control.The previous layout did not have a name…

Continue Reading The Difficulty with Names – 15th August