Dodgy Ducting – 25th September

The final part of track has been added and work had started on the shuttle electronics that will shunt the loco back and forth. The perils of eBay again - a OO gauge signal that will be more at home on Dockland O gauge!

Continue Reading Dodgy Ducting – 25th September

Trips and Slips – 2nd October

  • Post author:
  • Post category:Dockland

Malcolm C focussed on hiding the frog switching wiring on the double slip only to be interrupted to assist Ray in tracking down some problems on the CBUS control system.

Continue Reading Trips and Slips – 2nd October