Three Men and a Point – 6th April
One man working, two G'uvners.
One man working, two G'uvners.
Wiring the last point is challenging.
The loco has almost made it to the end.
Percy's turn to be 'run-in' on the test track
Thomas resumes service on Blocks A Go Go.
I'm sure I heard a call for more wires - maybe not!
Inch by inch, power is applied to the track, and the shunter moves forward.
The points on Dockland are reconnected to the mimic panel