You are currently viewing Commissioning – 29th September

Commissioning – 29th September

Malcolm H and Ray used red and blue jumper cables to connect the DC controller to the linear track set about testing. After re-soldering a dropper and cleaning the track – all was well.

Allan connected in the oval track using the white and red jumpers and had a shunter racing round the track – much to the disdain of the modellers present.

The new 3D printed modules to hold a servo and associated electronics were checked out. Two mirror image mounts will need to be printed before next week.