Slow Progress – 22nd June

Malcolm did further work on the point wiring and test the results. Some rework next week due to another member (me!) who forgot to bring in the right plugs! Other than that it is getting close to being able to do something useful with the boards.

Although the loop is substantially complete, the linear track will be replaced next week, using3D printed parts, similar to Test Board Two, to provide a more secure track bed.

Allan completed the under track wiring for Test Board Two but encountered an alignment problem between the track bed and the base. A replacement base section (shown) will be installed next week.

The next step will be to run the cabling to the points – yes – that really ought to have been done at the same time as the dropper wiring was put in place!