Class 08 – 21st August

  • Post author:
  • Post category:Dockland

Testing of the trackwork is now well underway with the help of a Class 08 shunter making its first outing. Some further investigation was needed around some of the points and the cutting of the track at the joints between the boards has meant that some more droppers are going to be needed,

Brown-out dongles have been added to the mimic panel and the servo controller boards. This will help protect the devices by switching off the microcontroller processors when the voltage drops below five volts, particularly during power downs.