You are currently viewing Droppers in Sight – 19th June

Droppers in Sight – 19th June

  • Post author:
  • Post category:Dockland

Allan ran the remaining droppers on the third board to the edge. Inevitably it took longer than planned and consumed more wire as the DCC cables were routed to minimise interference on the layout control bus.

Ray then used his trusty crimpers to connect the cables to the distributor boards using a range of colourful ferrules.