End in Sight – 23rd March

  • Post author:
  • Post category:Dockland

Dave and Malcolm are making great progesss, connecting up the track, section by section and testing as they go. Dave is in his usual position underneath the baseboard.

Further problems have emerged with the modules to supply power to the points (frog Juicers). Each module has a small microprocessor that needs programming. The original programs failed to work and they were reprogrammed again but the second batch were no better than the first. Some research on the net might be needed.

These clip on LED lights are being used to good effect to test the track as each section and point is connected to the DCC controller.

The LED is not illuminated in the middle section indicating that there isno power being supplied to the track.