You are currently viewing Pointing the Way – 23rd January

Pointing the Way – 23rd January

  • Post author:
  • Post category:Dockland

After a break which started last October, work has now resumed on the Dockland Layout.

First up was a test of the DCC power to the track. Most parts of the layout passed with flying colours. However one point, which seems to have suffered a bit during the building work on the club house, needs attention – the sparkies have been put on notice to get it fixed next week.

The next checks will be the pointwork so it seemed the right time to do some renovation work on the mimic panel – a new enclosure is being 3D printed at the time of writing this post.