You are currently viewing Portable Signals – 30th January

Portable Signals – 30th January

  • Post author:
  • Post category:Dockland

Last week a stryy dropper cable had been identified and attached to the right connector.

Then it was time to look at the point, Malcolm and Dave used the clip on lights to check that there was power in the parts of the point that ought to have it. Once rail didn’t seem to be connected so the point will have to be taken up next wee and the Peco wiring checked out.