Real Trackwork – 24th April

Real Trackwork – 24th April

Work has now resumed on Dockland – after a short intermission – with a vengeance. Dave and Malcolm C have now pinned the majority of the trackwork with the exception of the track at the back of the layout. The heavy mob will be needed next week to move the layout out so that this can be completed.

Custom trackwork is needed for the tracks leading to the turntable and this is now starting to take shape.

Allan spent some time trying to draw the new layout so that work can begin on making changes to the mimic panel that was produced some months ago.

Close Menu