You are currently viewing A Bridge Too Far – 29th October

A Bridge Too Far – 29th October

The second batch of baseboards has been crafted by Malcolm and on Wednesday afternoon Dave, Malcolm and Richard set to and completed the assembly.

The last component will be the movable bridge between the two layouts. No one dared ask Malcolm if it was still on his list of things to build.

No one dared mention the lonely filing cabinet either!