You are currently viewing Bridging the Gap – 1st June

Bridging the Gap – 1st June

As the plans have now morphed from a dumb bell layout into a more conventional ‘oval’, there is the need to build a second bridge.

Malcolm build a prototype – which fitted very well.

In the meantime, Allan tried, without success, to upgrade the case for the DCC hand held controller.

All should be ready for the track plan to be laid out later in the evening and then validated.