2nd January – Mind the Gap

2nd January – Mind the Gap

Refreshed after the Christmas break, it was time to get on with the task of getting the viaduct into the correct position and interfacing to the tracks at each end. 

Dave and Malcolm C hasve concluded that some further woodwork is required to enable the viaduct to be easily removed and then replaced with the accuracy that the tracks will demand.

No work for the sparkies this week, the trackwork has taken precedence again.

Richard has not been idle over the Christmas break and came with a partially compleed building for the wagon works.

The highlight of the work so far is the very effective windows on one side of the building.

Some doors are required and the plan at the moment is to prodicuce these using a 3D printer.