Power to the Points – 18th May
Malcolm starts running the DC supply to the point driver boards.
Inclinations – 18th May
Richard has been taking the layout to a new level.
New Loco on the Block – 11th May
Malcolm puts a newly chipped loco through its paces.
Planning Stage – 11th May
Paper planning and laying track out.
Three Tables – 20th April
Electronic projects on three tables this week.
Points of View – 13th April
A third point servo is installed.
Brown Baseboards – 13th April
Richard and Tony, armed with paint brushes.
Clips and Continuity – 6th April
Wiring bliss - continuity prevails
- 1
- 2
- 3
- 4
- …
- 11
- Go to the next page